Overview
The Project View tab is a kanban-style board for organizing and tracking remediation work. Use it to group security controls into projects, assign tasks, and collaborate with clients on remediation priorities.

Create a Project
Click "Create New Project" to start a new remediation project. Switch between projects with the dropdown selector at the top of the page.
Project Settings
Each project has these options:
- Visible to client — makes the project visible in the Client Portal, so clients can see ongoing remediation work
- Approval needed — requires client approval before work on the project begins
- Project Approved by Client — shows approval status, with the approver's email and the date
Kanban Board
Remediation tasks move through four columns:
- Todo — controls that need to be addressed
- Planned — controls scheduled for remediation
- In Progress — controls currently being worked on
- Done — controls successfully remediated
Task cards
Each card represents a security control and shows:
- Control ID — the control reference (e.g., all-6.3.1)
- Description — what the control checks for
- Status — current column
- Date — when the task was created or last updated
- Assignee — the team member responsible for the remediation
Best Practices
- Turn on Approval needed for projects that change sign-in or mail flow, so the client signs off before work starts.
- Use Visible to client to show progress in the Client Portal instead of sending separate status updates.